RULES & GUIDE LINES:
- It is a team event with a minimum of 2 members with an objective of fabricating bridge model of their choice in a fixed time.
- Sticks (unlimited), Gum, Cutter and Thread only will be allowed for the fabrication and are provided at the time of event.
- Selection criteria is based on Architecture, Dead weight and Maximum load measured at 30 cm span, 11 cm width and length not less than 40 cm.
- A maximum of 10 teams will be shortlisted if more teams are registered for the event by a screening test comprises of short answers/multiple choice questions in Solid mechanics, Structural analysis and other general topics in civil engineering.
- Duration of model making- 1 hr 30 Min + 10 min Grace
- Failure load to the dead weight of the structure is used to assess the efficiency of model.
|